Add phase description to a project

Description

This ticket was raised by Norway as part of the standardisation in Norway and shall be used commonly in the future.

is a sub-element of the high-level element (see trac ticket #390), both were introduced in railML2.4nor. This element refers to phases a project can be in. In addition to a selection of the common attributes listed in chapter 3.7 (document linked below), this element has the following attributes: @regulationPhase, @planningPhase.

For more details see document “railML2.4nor Infrastructure Documentation“ (https://www.jernbanedirektoratet.no/railML), version 1.3, 03.07.2020, point 4.13.3.

Which of the existing elements can be used?

  • none

Background

[…]

Links

  • Forum discussion:
  • https://www.railml.org/forum/index.php?t=msg&goto=2682
  • Trac tickets:
  • #390
  • Wiki documentation:
  • none

Proposed solution in railML 2.5

Implemented without planningStage and regulationStage

Proposed solution in railML 2.6

Reconsider planningStage and/or regulationStage.

A possible source for stage names with some authority is the German HOAI (see translations of the stages at https://www.repetico.de/card-52653696). Suggested grouping by Vasco:

1. Establishing the basis of the project
2. Preliminary design and variants
3. Final design
4. Building permission design
5. Execution design
6.+7. Award process
8.+9. Construction supervision, control and documentation 