Add alternative description to a project
Description
This ticket was raised by Norway as part of the standardisation in Norway and shall be used commonly in the future.
is a sub-element of the high-level element (see trac ticket #390), both were introduced in railML2.4nor. This sub-element is used to describe alternatives in the planning phase of a project, e.g. tunnel vs. non-tunnel construction. It therefore only applies to infrastructure of status “planned” and “conceptual”. The element has a selection of the common attributes (see chapter 3.7 of document linked below).
For more details see document “railML2.4nor Infrastructure Documentation“ (https://www.jernbanedirektoratet.no/railML), version 1.3, 03.07.2020, point 4.13.3.
Which of the existing elements can be used?
- none
Background
[…]
Links
- Forum discussion:
- […]
- Trac tickets:
- #406
- Wiki documentation:
- none
Proposed solution in railML 2.5
tbd