Infrastructure change management
Description
Infrastructure is changing over time: new components are being added, others being removed and the railway network is being adapted.
For railML 3.x implementation it shall be possible to define infrastructure in different states (in operation / under construction / ...) within one railML file. Further, it shall be possible to track the changes of the infrastructure, e.g. in form of changesets.
Background
A change of infrastructure can be one of these three types:
- create - a new element has been introduced
- modify - an element has been modified
- delete - an element has been deleted
Links
- Forum discussion:
- Torben Brand, 31.08.2017: [https://www.railml.org/forum/index.php?t=msg&th=531&start=0&]
- Lucien Weller, 11.01.2018: [https://www.railml.org/forum/index.php?t=msg&th=545&start=0&]
- Trac tickets:
- Wiki documentation:
Proposed solution for railML 3.3
tbd