parallel use of train protection systems
Description
The infrastructure element shall allow the definition of several train protection system which are available in parallel, e.g. PZB and LZB or PZB and ETCS.
Links
- Forum discussion
- Susanne Wunsch, 19.04.2010: [https://www.railml.org/forum/index.php?t=msg&goto=237&&srch=protection#msg_237]
- Trac ticket
- Wiki documentation
Proposed solution railML 3.1
A in railML 3.x is handled like any other functional infrastructure element: It can be placed "somewhere" in the track network using *<location> child elements. Locations of various elements may overlap and thus define multiple train protection systems for a certain part of the track.